We have experienced or have planned a utility outage on the following system(s):

<empty> Industrial Cooling Water <empty> Drinking Water (Domestic Water)
<empty> Sanitary Sewer <empty> Chilled Water (Process)
<empty> Natural Gas <empty> Low Conductivity Water (LCW)
<empty> Electrical  <empty> Other:   
<empty> Indicates applicable system

FOR YOUR INFORMATION: ComEd is installing a switch.

LOCATION :  Areas affected will be Village Labs.

SCHEDULE: : Work is scheduled to beginning on Saturday, April 9th at 7:00 a.m. and completed on Saturday, April 9th 2016 around late afternoon (when ComEd gets done they will contact us).

Contact building manager for outage accommodation services such as relocation, emergency power, emergency restroom facilities, etc.

Need more info?
Contact the Outage Coordinator Joe Pathiyil, at ext.3004 cell phone 630-404-0110, or Larry Sliwa, at ext. 3582.